To better serve our many subscribers that are working from home during this time, we are offering digital issues of TBM: Tunnel Business Magazine.  Please subscribe below to ensure delivery of future digital editions. Thank you and be well.

CIMIC’S Leighton Asia Awarded $1.58 B Tunnel Project

0

Tseung Kwan O – Lam Tin TunnelCIMIC Group company Leighton Contractors (Asia) Limited (‘Leighton Asia’), in joint venture with China State Construction Engineering (Hong Kong) Limited, has been awarded an $1.21 billion (US) contract by the Government of the Hong Kong Special Administrative Region for the construction of Tseung Kwan O – Lam Tin Tunnel.

Tseung Kwan O – Lam Tin Tunnel will meet the traffic demand arising from the anticipated population increase in Tseung Kwan O through the future development of the district.

/**** Advertisement ****/

CIMIC Group Executive Chairman and Chief Executive Officer Marcelino Fernández Verdes said: “Delivering large infrastructure projects in busy urban areas is a core capability for Leighton Asia. We value the opportunity to contribute our civil engineering capabilities to accommodate future growth through the expansion of infrastructure in such a fast growing city.”

RELATED: Mott MacDonald to Design Passenger, Baggage Tunnels at Hong Kong Airport

Leighton Asia Managing Director Manuel Alvarez Munoz said: “Leighton Asia has developed strong working relationships with both our JV partner, China State, and with our client, the Hong Kong government. Through continued delivery of infrastructure that enhances Hong Kong’s transport systems, we are in a good position for future work.”

The scope of works for the project includes the construction of a 2.2-km dual two‐lane highway tunnel together with associated slip roads, branch tunnels, viaducts and tunnel portal facilities. The works also involve the delivery of two ventilation buildings and an administration building, as well as implementation of all associated building and supporting works.

Works were schedule to commence in July 2016 and take approximately five years to complete.

Share.

About Author

Comments are closed.