Two TERRATEC TBMs made a historic double breakthrough on Nov. 14, marking the end of tunneling works on the 36.4-mile Pi...
On June 8, 2016, one of two 6.4-m (21.0-ft) diameter mixed-face EPB machines achieved breakthrough at Namma Metro (Banga...
TERRATEC announced the delivery of a new double shield TBM to SELI Overseas S.p.A. for construction of the Vishnugad-Pip...
On Jan. 27, 2016, a Robbins mixed ground EPB broke through at Chennai Metro in India, finishing up a challenging second...