Doan Valley Storage Tunnel Project Wins ACEC of Ohio Award
Through a 7-year contract, the McMillen Jacobs Associates–Wade Trim Joint Venture team performed final design services for this 3.7-mile long (6 km) tunnel system, which includes an 18-ft diameter (7.2 m), 9,900-ft long (3,018 m) CSO storage tunnel, and two 8.5-ft diameter (2.6 m) conveyance tunnels—6,400 ft and 3,050-ft long (1,950 m and 903 m), respectively—excavated through rock. The system also includes six shafts, several near-surface diversion and flow control structures, regulator modifications, and various consolidation sewers. Construction was completed within budget and is now fully operational.
The $142 million project was constructed by McNally/Kiewit DVT JV.
RELATED: Mott MacDonald, Stantec Win Engineering Award for NEORSD’s Easterly Tunnel System
Comments are closed here.