Despite COVID-19, flood and other obstacles, on July 27, 2020, the hard rock slurry balance pipe jacking machine (DN4000...
On May 8, 2020, China’s largest diameter (9.83-m) gripper hard rock tunnel boring machine (“Yunling”),...
An 11.7-m slurry shield machine manufactured by CREG (China Railway Engineering Equipment Group Co., Ltd.), broke throug...
Two large shield tunneling machines rolled off the production line Dec. 4 in Zhengzhou, capital of central China’s...
China Railway Engineering Equipment Group Co., Ltd. (CREG) held a ceremony for the EPB TBM named Qianjin (CREC 773) on J...
China Railway Engineering Equipment Group Co., Ltd. (CREG) held a launch ceremony June 18 for a water jet hard rock TBM....
On May 4, 2019, more than 80 Chinese industry experts, teachers and students from domestic TBM tunnel engineering planni...
A CREG double-shield TBM (“CREC383”) mining an access tunnel of Lot 6111 on Shenzhen Metro Line 6 successful...
China Railway Engineering Equipment Group Co. Ltd. (CREG) and METALLIANCE on Feb. 8 announced a strategic partnership wh...
China’s largest slurry tunnel boring machine (TBM) rolled off the production line in Zhengzhou, capital of central...
On May 5, 2017, CREG’s 3.5-m diameter gripper TBM Lèa made its first breakthrough of Tunnel Drive 3 in the Greater Be...
More than 300 guests, including Israeli and Chinese dignitaries, were on hand to celebrate the launch of a CREG EPB TBM...