\
Lithos Engineering announced the addition of Richard (Bo) Botteicher, PE, to its team. Botteicher brings over 20 ye...
Lithos Engineering announced the addition of James Carroll, P.E., to its team. Carroll has over 15 years of tunnel and u...
Lithos Engineering announced that Sarah Myers has joined the firm. Although new to Lithos, Myers is not new to the ...
Lithos Engineering, which is nearing its fourth anniversary, has announced the hiring of two new staff members: Adam Pri...
As the popularity and use of Geotechnical Baseline Reports (GBRs) on tunnel projects grows, we often find ourselves bein...
Lithos Engineering announced that Matthew Olson has joined the team. Olson is a Professional Engineer licensed in Washin...
Lithos Engineering announced that Evan Friedman has joined the firm. Friedman is a Professional Engineer and Professiona...
The City of Fort Collins, Colorado, is preparing for the construction of the Michigan Ditch Tunnel Project, which will h...
In March 2016, Amara Meier joined Lithos Engineering as a geological engineer and will be based out of the firm's Lakewo...
Lithos Engineering is open for business in Colorado, providing tunnel, trenchless, geotechnical, and geological engineer...